Pre-Construction Study
Pre-Construction Study – September 19th, 2017
- A1 – Municipal Roadways Utilized
- A2 – Municipal Signage Impacted
- A3 – Windlectric Baseline Video Survey Commitment
- B1 – Municipal Road Geotechnical Report
- B2 – Culvert Conditions – September 20 2017
- B3 – Additional Geotechnical Information
- E – Collection System Work
- F1 – Schedule for Pre-Construction and Collection System Work
- F2 – Summary Project Schedule
- G1 – Project Engineer Cover Letter
- G2 – Pre-Construction Construction Post-Construction Work
- G3 – Collection System Cost Breakdown by Roads
- H – Post-Construction Remedial Specifications
Pre-Construction Study – August 30th, 2017
- A1 – Municipal Roadways Utilized
- A2 – Municipal Signage Impacted
- B1 – Municipal Road Geotechnical Report
- B2 – Culvert Conditions
- MR 100 Index & Key
- MR 200-214 South Shore Road
- MR 215-220 Lower Forty-Foot Road
- MR 221-242 Front Road
- MR 243-261 Second Concession Road
- MR 262-279 Third Concession Road
- MR 280-285 Stella Forty-Foot Road
- MR 286-288 Dump Road
- MR 289 Typical Sections
- MR 300-303 Intersections
- C Series Drawings Part 1
- C Series Drawings Part 2
- E – Collection System Work
- F1 – Schedule for Pre-Construction & Collection System Work
- F2 – Summary Project Schedule
- G1 – Project Engineer Cover Letter re: Pre- and Post Construction & Collection System Studies
- G2 – Pre-Construction Preparatory, Construction, & Post-Construction Work Cost Estimate
- G3 – Collection System Cost Breakdown by Roads
- H – Post-Construction Remedial Specifications
Pre-Construction Study (17/08/2017)
Revisions to numerous schedules. Other schedules not referenced remain unchanged.
- B2 Culvert-Conditions
- D Pre-Construction Preparatory Work
- MR100 Index & Key
- MR200 – 214 South Shore Road
- MR215 – 220 Lower Forty-Foot Road
- MR221 – 242 Front Road
- MR243 – 261 Second Concession Road
- MR262 – 279 Third Concession Road
- MR280 – 285 Stella Forty-Foot Road
- MR286 – 288 Dump Road
- MR300 – 303 Intersections
- C Series Drawings Part 1
- C Series Drawings Part 2
- E Collector System Work
- G1 Project Engineer Cover Letter re: Pre & Post Construction & Collection System Studies
- G2 Pre-Construction Preparatory & Construction Period Work
- G3 Collection System Cost Breakdown by Roads
- H Post-Construction Remedial Specifications
Pre-Construction Study (09/08/2017)
Revisions to numerous schedules. Other schedules not referenced remain unchanged.
- A2 – Municipal Signage Impacted
- B1 – Municipal Road Investigation
- D Pre-Construction Preparatory Work
- MR100 Index & Key
- MR200 – 214 South Shore Road
- MR215 – 220 Lower Forty-Foot Road
- MR221 – 242 Front Road
- MR243 – 261 Second Concession Road
- MR262 – 279 Third Concession Road
- MR280 – 285 Stella Forty-Foot Road
- MR286 – 288 Dump Road
- MR300 – 303 Intersections
- C Series Drawings Part 1
- C Series Drawings Part 2
- F1 Schedule Pre-Construction & Collection System Work
- F2 Summary Project Schedule
- G Collection System Cost Estimate
- G Pre-Construction Prep & Construction Period Work
- I Post-Construction Preliminary Estimate
Pre-Construction Study (10/05/2017)
Pre Construction Study Rev 1 Cover Letter
Section A
Section B
Section C
Section D
- D.01 – Key Map and Index
- D.02 – MR200 – MR214 – South Shore Road
- D.03 – MR215 – MR220 – Lower Forty Foot Road
- D.04 – MR221 – MR242 – Front Road
- D.05 – MR243 – MR261 – Second Concession Road
- D.06 – MR262 – MR279 – Third Concession Road
- D.07 – MR280 – MR285 – Stella Forty Foot Road
- D.08 – MR286 – MR 288 – Dump Road
- D.09 – MR300 – MR303 – Public Road Intersections
- D.10 – C100, C200 – C214 – Entries to Private Access Roads
Section E
Section F
- F.01 – Schedule for Pre-Construction Preparatory Work and Collection System Work
- F.02 – Summary Project Schedule
Section G
Section H
Section I
- Cover Letter
- Section A – Impacted Municipal Infrastructure
- Section B – Existing Conditions Evaluation
- Section C – Environmental Monitor – referenced in cover letter
- Section D – Pre-construction Preparatory Work Plans & Drawing
– AIWF C205
– AIWF MR200-207
– AIWF MR208-210
– AIWF MR211-221
– AIWF MR222-231
– AIWF MR232-240
– AIWP MR241-243 - Section E – Collection System Work
– Part 1
– Part 2 - Section F – Schedule
- Section G – Cost Estimates & Section I – Post-construction Remedial Works Estimate
- Section H – Post-construction Remedial Works Specification