1. An incorrect version of Schedule 19 was provided in our submission on March 28. The correct version of this schedule has been uploaded to the project website (http://amherstislandwindproject.com).
2. The reference in the last sentence of the first paragraph to Section 2.1.2 of the Operations Plan will be corrected in the next version to read as follows:
The routes and the direction of travel for the delivery of Heavy Loads are identified in Schedule 03
3. The reference to these Schedules in the Traffic Management Plan need to be updated as follows:
Construction vehicles (including gravel trucks and deliveries of turbine components) and equipment will reach the 26 turbine sites based on the Delivery Routes for Heavy Loads Drawing AMHST-207,